Building Industry - Contract Floor Layer Minimum Rate Order Award
  
Date05/08/2008
Volume365
Part4
Page No.1233
DescriptionRVIRC - Award Review Variation by Industrial Relations Commission
Publication No.C6485
CategoryAward
Award Code 066  
Date Posted05/08/2008

spacer image spacer image

spacer image Click to download*
spacer image
(066)

(066)

SERIAL C6485

 

BUILDING INDUSTRY - CONTRACT FLOOR LAYER MINIMUM RATE ORDER AWARD

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Review of Award pursuant to Section 19 of the Industrial Relations Act 1996.

 

(No. IRC 1740 of 2007)

 

Before Commissioner Tabbaa

4 March 2008

 

VARIATION

 

1.          Delete clause 2, Rates of Payment, of the award published 29 April 2005 (350 I.G. 559), and insert in lieu thereof the following:

 

2.  Rates of Payment

 

Schedule Of Commercial Rates

 

 

$

Daily Minimum Charge

144.72

Hourly Rate

39.15

Fixing Rates

 

Vinyl Tiles 20-49m2

6.78

 

50-100m2

5.41

 

100-249m2

4.06

 

250 and over

2.92

Sheet Vinyl (incl. Welding)

 

 

20-49m2

7.67

 

50-249m2

5.26

 

250 and over

4.69

For Safety Vinyl and Corlon

1.69

For Safety Vinyl over 3mm

2.58

For Linoleum

2.58

Hardboard Underlay (including supply of staples by contractor)

 

 

20-49m2

7.23

 

50m2 and over

4.96

Restaple Hardboard m2

2.09

Hardboard Underlay on pineboard

 

 

M2 Additional Rate

0.74

Decorative Tiles - VT rate + 50%

 

Decorative Tiles - Boarders and squares - Decorative Tile + 50%

 

Cork Tile - laying out m2

9.10

PVC nosing Lin Metre

4.59

Aluminium Nosing to Timber per lm

6.21

Aluminium Nosing to Concrete per lm

10.55

Stair Treads per lm

5.60

Stair Risers per lm

5.60

Treads and Risers covered per lm

10.55

Ripple trims to timber per lm

3.11

Ripple trims to concrete per lm

5.60

100mm skirting per lm

2.43

150mm skirting per lm

3.04

100mm flat skirting over carpet or smoothedge - per lm

3.18

150mm flat skirting over carpet or smoothedge - per lm

3.57

Reducing and capping strip - per lm

2.76

Preform cove - per lm

2.12

Stringer to walls per lm

4.80

Stringer to stairs per lm

12.72

Cementuous skim coat 1mm

2.28

Smoothing compound (k15/k10)

2.76

 

Above two items include priming and sanding

 

Cement based primer

2.25

Two pack primer

0.74

Grinding concrete - hourly rate

38.25

Acid etch etc - hourly rate

38.25

Fill expansion joints - hourly rate

38.25

 

Raking and cutting included in rates

 

Cover sheet vinyl up to 100mm height per lm

5.60

Cover sheet vinyl over 100mm height per lm

6.21

Rubber tiles m2

10.48

Sheet Vinyl to walls (incl. Welding)

13.50

Bulletin Board m2

18.03

Take Ups

 

 

Take up

loose lay m2

1.73

 

Take up

stuck m2

5.31

 

Take up

PVA mr

8.77

 

Take up

hardboard and coverings including removal of staples m2

 

 

Take up

stair tread nosing (PVC) - per lm

1.41

 

Take up

stair tread nosing (Alum) - per lm

5.31

Bar Tops

43.73

Fares/Travel

 

 

Travelling time outside metropolitan area per hour

32.47

 

Accommodation per day

103.79

 

Travelling per km return

0.97

Moving Furniture - Hourly Rate

38.25

Cancellation Fee

46.31

 

SCHEDULE OF DOMESTIC FIXING RATES

 

Minimum Charge

$

183cm x 2m vinyls (except inlaid) - 1m

19.57

183cm inlaid vinyl (if layer supplies template paper - 1m

24.01

274cm vinyl - 1m

27.15

366cm x 4m vinyl - 1m

32.43

Daytile with border and squares m2

14.63

Vinyl tiles m2

11.36

Hardboard m2

8.13

K10 and Ardit (labour only) m2

3.04

PVA (labour only) m2

12.01

Additional rate for stairs in addition to rate per metre - per stair

5.37

Cove skirting - 1m

4.81

Preform fillet - 1m

3.04

TAKE UPS:

22.58

Loose laid material per room

 

Stuck down including hardboard m2

11.36

Direct to subfloor m2

15.07

Electrical appliances, removal and replace - per appliance

7.50

MINIMUM CHARGES (labour only) PVA:

 

Laundry

141.41

Bathroom

141.41

Other areas (of total job etc)

80.80

Ardit Z8

80.80

Mastick K10

80.80

ACCESSORIES, TRIM ETC.

 

 

Small - 1m

3.27

 

Large - 1m

3.11

 

To supply adhesive m2

1.05

CANCELLATION CHARGE: travel time to & from employers premises to site

 

at hourly rate

 

SERVICE CHARGE: If layer has to return to site to carry out rectification not

46.31

own fault - hourly rate plus the service charge shown

 

 

2.          Delete the amount of "$36.99" appearing in paragraph 4.1(a), of clause 4, Compensation for Travel Patterns, Mobility Requirements of Contract Floor Layers and the Nature of Engagement in the Construction Work Covered by this Award, and insert in lieu thereof the following:

 

"$39.15"

 

3.          Delete amount of "$98.05" appearing in subclause 5.1 of clause 5, Living Away from Home - Distant Work, and insert in lieu thereof the following:

 

"$103.79"

 

4.          Delete subclause 7.3 of clause 7, Adjustment of Rates, and insert in lieu thereof the following:

 

7.3        The rates of pay in this award include adjustments payable under the State Wage Case 2007. These adjustments may be offset against:

 

any equivalent overaward payments, and/or

 

award wage increases since May 1991 other than safety net, State Wage Case and minimum rates adjustments.

 

5.          Delete the amount of "$44.26" appearing in subclause 10.2 of clause 10, Rectification Work, and insert in lieu thereof the following:

 

"$46.85"

 

6.          Delete subclauses 17.4 and 17.5 of clause 17, Area, Incidence and Duration and insert in lieu thereof the following:

 

17.4      The changes made to the award pursuant to the Award Review pursuant to section 19(6) of the Industrial Relations Act 1996 and Principle 26 of the Principles for Review of Awards made by the Industrial Relations Commission of New South Wales on 28 April 1999 (310 I.G. 359) take effect on and from 4 March 2008.

 

17.5      This award remains in force until varied or rescinded, the period for which it was made already having expired.

 

 

 

I. TABBAA, Commissioner.

 

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'