State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

SAWMILLERS, &c. (STATE) AWARD
  
Date02/14/2003
Volume338
Part4
Page No.
DescriptionVSW - Variation following State Wage Case
Publication No.C1745
CategoryAward
Award Code 588  
Date Posted02/13/2003

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(588)

SERIAL C1745

 

SAWMILLERS, &c. (STATE) AWARD

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Construction, Forestry, Mining and Energy Union (New South Wales Branch), industrial organisation of employees.

 

(No. IRC 6103 of 2002)

 

Before Commissioner O'Neill

14 November 2002

 

VARIATION

 

1.          Delete paragraph 20.8.1 of subclause 20.8 of clause 20, Wage Rates, of the award published 15 June 2001 (325 I.G. 480) and insert in lieu thereof the following:

 

20.8.1   Arbitrated safety net adjustment - The rates of pay in this award include the adjustments payable under the State Wage Case - 2002.  These adjustments may be offset against:

 

(a)        any equivalent overaward payments; and/or

 

(b)       award wage increases since 29 May 1991 other than safety net, State Wage Case, and minimum rates adjustments.

 

2.          Delete the amount of $1.60 appearing in paragraph 20.1.2 [at number 20 (e)] of the said clause 20 and insert the amount of $1.66.

 

3.          Delete Part I, Monetary Rates and insert in lieu thereof the following:

 

PART I - MONETARY RATES

 

Table 1 - Wages

 

Skill

 

Supplementary

Total Award

 

Reference

Level

Base Rate

Payment

Rate

Hourly Rate

Rate

 

$

$

$

$

%

Level 6

491.50

54.60

546.10

14.37

105

Level 5

473.20

52.00

525.20

13.82

100

Level 4

443.40

48.10

491.50

12.93

92.4

Level 3

425.20

45.40

470.60

12.38

87.4

Level 2

405.50

42.50

448.00

11.79

82

Level 1

390.80

40.60

431.40

11.35

78

 

Table 2 - Allowances

 

Item No.

Clause No.

Brief Description

Amount

 

 

 

$

1

25.1

Handling submerged timber

69c per hour

2

25.2

Handling charred timber

3.42 per day

3

25.4.1

Motor vehicle allowance

57c per kilometre

4

25.5 & 25.6

Meal allowance

8.39 per meal

5

25.7

Camping allowance

19.42 per day

6

25.7

Maximum camping allowance

136.37 per week

7

25.8

First-aid Allowance

10.07 per week

8

25.9

Leading Hand: 2 to 6 employees

17.33 per week

9

25.9

Leading Hand: over 6 employees

27.02 per week

 

4.          Delete the words 'State Wage Case Decision - 2001' appearing in Part 2 - Special Rates and Conditions for Pit-Timber Cutters of Appendix A - Harvesting and Environment/Forest Management Sector, and insert in lieu thereof the words 'State Wage Case Decision - 2002'.

 

5.          Delete the table appearing in subclause 1.3 of clause 1, Prices of the said Part 2 of Appendix A and insert in lieu thereof the following:

 

 

Per week

 

$

Base rate

431.75

25 per cent piecework loading

107.94

 

539.69

 

Equipment allowance

96.59

Disability allowance

18.55

Total:

654.83

 

6.          Delete the table appearing in subclause 2.1 of clause 2, Wage Rates - Adults, of Part 2 of Appendix A and insert in lieu thereof the following:

 

Number

Classifications

Broadbanded

 

 

Group

Base rate

1

timber cutter driver

3

431.40

2

of a motor lorry or wagon carrying pit-timber shall be

 

 

 

paid the relevant rate per week, prescribed in classification 6, Wage

 

 

 

rates of the award in force from time to time Offsider to driver of

 

 

 

motor lorry or wagon shall be paid the wages as provided by

 

 

 

classification 6, of the award in force from time to time

 

 

3

Tractor driver

5

471.20

 

7.          Delete the amount of $17.92 appearing in clause 4, Disability Allowance of Part 2 of Appendix A and insert the amount of $18.55.

 

8.          Delete the table appearing in paragraph 5.1.2 of subclause 5.1, Weekly wage employees of clause 5, Annual Leave of Part 2 of Appendix A and insert in lieu thereof the following:

 

 

$

Total wage of $394.20 plus supplementary payment of $45.40

470.60

25 per cent piecework loading

117.65

 

588.25

 

 

Equipment allowance

96.59

Disability allowance

18.55

Total:

703.39

 

9.          Delete the amount of $3.91 appearing in subclause 7.1 of clause 7, Camping Allowance of Part 2 of Appendix A and insert the amount of $4.02.

 

10.        Delete the amount of $13.65 appearing in subclause 7.2 of the said clause 7 of Part 2 of Appendix A and insert the amount of $14.03.

 

11.        Delete the amounts of $3.91 and $13.65 appearing in subclause 7.3 of clause 7 of Part 2 of Appendix A and insert the amounts of $4.02 and $14.03 respectively.

 

12.        Delete the table appearing in clause 1 of Item 1of Schedule - Minimum Prices for Piecework Cutting and Snigging appearing at the end of Appendix A and insert in lieu thereof the following:

 

10 cm and under

$87.45 per cubic metre

12 cm

$79.97 per cubic metre

14 cm

$74.93 per cubic metre

16 cm

$72.44 per cubic metre

18 cm

$74.93 per cubic metre

20 cm and over

$81.19 per cubic metre

 

13.        Delete the amount of $0.9233 appearing in clause 1 of Item 2 of the said Schedule and insert the amount of $0.9556.

 

14.        Delete the table appearing in Item 3 of the said Schedule and insert in lieu thereof the following:

 

10 cm prop

54.37 cents each

12 cm prop

70.74 cents each

14 cm prop

86.12 cents each

16 cm prop

$1.0024 each

18 cm prop (leg)

$1.1525 each

 

15.        Delete the table appearing in clause 1 of Item 5 of the said schedule and insert in lieu thereof the following:

 

Slabs, Pit Sleepers, Lagging

Ordinary slabs

Sawn square

 

(not gauge cut)

(gauge cut)

 

$

$

Up to 150 cm2 end section

76.96 m3

90.96 m3

Over 150 cm2 end section

99.00 m3

123.48 m3

 

Railway sleepers, square sleepers, sets,

 

Ironbark and

girders, transoms

Hardwood

Approved Hardwood

 

$

$

Up to 225 cm2 end section

123.48 m3

140.57 m3

Over 225 cm2 end section

140.57 m3

164.99 m3

 

 

 

Lids

 

 

 

 

 

Up to 57 cm2 end section

$78.60 m3

 

 

 

 

Caps

 

 

 

 

 

Over 57 cm2 end section

$103.20 m3

 

 

 

 

Wedges

 

 

 

 

 

10 cm x 2.5 cm and over

$206.82 m3

 

 

16.        Delete the table appearing in clause 2 of the said Item 5 of the schedule and insert in lieu thereof the following:

 

Slabs, pit sleepers, lagging caps, lids and wedges

$38.05 m3

 

 

Railway sleepers, squared sleepers, sets, girders and transoms

 

 

Up to 225 cm2 end section

$57.39 m3

Over 225 cm2 end section

$76.65 m3

 

17.        Delete the table appearing in clause 1 of Item 6 of the schedule and insert in lieu thereof the following:

 

16 x 18 cm

18 x 9 cm

20 x 10 cm

22 x 11 cm and over

$28.32 m3

$24.62 m3

$22.16 m3

$19.68 m3

 

18.        Delete clause 1 of Item 7 of the schedule and insert in lieu thereof the following:

 

 

 

$

1.

Logs (for conversion into sawn mining timber)

17.91

 

Sawn timber

30.29

 

19.        Delete Item 8 of the schedule and insert in lieu thereof the following:

 

Item 8

 

Wedges, lids, caps, props and half round bars - bundling per 100 pieces

 

 

Wages

Gear Allowance

Total

 

$

$

$

Wedges

3.00

0.69

3.69

Lids

4.06

0.94

5.00

Caps

4.99

1.15

6.14

Props all sizes

47.41

11.13

58.55

Half round bars

47.41

11.13

58.55

 

20.        Delete Item 9 of the schedule and insert in lieu thereof the following:

 

Item 9

 

Drilling of holes - right angle - rate per 100 holes

 

 

Wages

Gear Allowance

Total

 

$

$

$

Up to 2.5 cm diameter

31.11

7.16

38.27

Over 2.5 cm to 3.15cm

41.42

9.54

50.95

Over 3.15cm to 3.75 cm

77.86

17.94

95.80

Over 3.75cm

103.79

23.92

127.71

 

Holes drilled other than at right angles - rate per 100 holes

 

 

Wages

Gear Allowance

Total

 

$

$

$

Up to 2.5 cm diameter

41.44

9.43

50.86

Over 2.5 cm to 3.15cm

67.21

15.55

82.76

Over 3.15cm to 3.75 cm

96.13

23.92

120.05

Over 3.75cm

132.21

29.89

162.10

 

21.        Delete the table appearing in clause 2, Wage Rates, of Part 2 - Special Rates and Conditions for Furniture Manufacturers of Appendix D - Manufacturing and Joinery Sector and insert in lieu thereof the following:

 

 

 

 

Total Minimum

 

 

Supplementary

Arbitrated Safety

 

Base Rate Per

Payment Per

Net Amount Per

 

Week

Week

Week

 

$

$

$

A Grade Machinist

473.20

52.00

525.20

B Grade Machinist

443.40

48.10

491.50

Single drum, cone or disc sander

425.20

45.40

470.60

Miscellaneous

417.50

44.30

461.80

 

22.        Delete the words 'State Wage Case - 2001' appearing in the said clause 2 of Part 2 of Appendix D and insert in lieu thereof the words 'State Wage Case - 2002'.

 

23.        Delete the table appearing in subclause 1.5 of clause 1, Wage Rates - Adults of Part 3 - Special Rates and Conditions for Sporting Goods Section of the said Appendix D and insert in lieu thereof the following:

 

Employees supervised

Leading hands - per week

 

$

2 to 6 employees

13.17

7 to 10 employees

21.37

Over 10 employees

32.73

 

24.        Delete the table appearing in clause 2, Wage Rates, of the said Part 3 of Appendix D and insert in lieu thereof the following:

 

 

Base Rate Per

Supplementary

Total Minimum Arbitrated

 

Week

Payment Per Week

Safety Net Amount Per Week

 

$

$

$

Group 1

443.40

48.10

491.50

Group 2

425.20

45.40

470.60

Group 3

405.50

42.50

448.00

Group 4

390.80

40.60

431.40

 

25.        Delete the words 'State Wage Case - 2001' appearing in the said clause 2 of Part 3 of Appendix D and insert in lieu thereof the words 'State Wage Case - 2002'.

 

26.        Delete the words 'State Wage Case - 2001' appearing in subclause (a) (iii) of clause 8, Wages of Appendix F - Forest and Building Products (State) Training Wage Appendix and insert in lieu thereof the words 'State Wage Case - 2002'.

 

27.        Delete Part B, Monetary Rates of the said Appendix F and insert in lieu thereof the following:

 

PART B

 

MONETARY RATES

 

Table 1 - Industry/Skill Level B:

 

Where the accredited training course and work performed are for the purpose of generating skills which have been defined for work at industry/skill level B.

 

Highest Year of Schooling Completed

School Leaver

Year 10

Year 11

Year 12

$

$

$

$

 

200.00

219.00

255.00

plus 1 year out of school

219.00

255.00

294.00

plus 2 years

255.00

294.00

345.00

plus 3 years

294.00

345.00

392.00

plus 4 years

345.00

392.00

 

plus 5 years or more

392.00

 

 

 

*Figures in brackets indicate the average proportion of time spent in approved training to which the associated wage rate in applicable.  Where not specifically indicated, the average proportion of time spent in structured training which has been taken into account in setting the rate is 20 per cent.

 

Table 2 - School Based Traineeships

 

 

Year 11

Year 12

 

$

$

School based traineeships skill levels A, B and C

200.00*

219.00*

 

*Assumes that the average proportion of time spent in structured training is 20 per cent.

 

28.        This variation shall take effect from the first full pay period to commence on or after 14 November 2002.

 

 

B. W. O'NEILL, Commissioner.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'