State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)




No longer in force


spacer image spacer image

BRICK AND PAVER INDUSTRY (STATE) AWARD
  
Date03/04/2005
Volume348
Part7
Page No.
DescriptionVSW - Variation following State Wage Case
Publication No.C2864
CategoryAward
Award Code 057  
Date Posted03/03/2005

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(057)

SERIAL C2864

 

BRICK AND PAVER INDUSTRY (STATE) AWARD

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by The Federated Brick, Tile and Pottery Industrial Union of Australia, New South Wales Branch, industrial organisation of employees.

 

(No. IRC 3492 of 2004)

 

Before The Honourable Justice Kavanagh

30 June 2004

 

VARIATION

 

1.          Delete subclause 5.2.1 of clause 5.2, Wages, of Part 5, Wages and Related Matters, of the award published 1 September 2000 (318 I.G. 236) and insert in lieu there of the following:

 

5.2.1     State Wage Case Adjustments

 

The rates of pay in this award include the adjustment payable under the State Wage Case of 2004.  This adjustment may be offset against:

 

(a)        any equivalent over-award payments; and/or

 

(b)       award wage increases since 29 May 1991 other than safety net, State Wage Case and minimum rates adjustments.

 

State Wage Case

Increase

Allowances

 

$

%

May 2000

15.00

3.1

May 2001

13.00/15.00

3.0

May 2002

18.00

3.5

May 2003

17.00

3.2

June 2004

19.00

3.5

 

2.          Delete Part B, Monetary Payments, and insert in lieu thereof the following:

 

PART B

 

MONETARY PAYMENTS

 

Table 1

 

(a)        Automated and Semi-automated Yards:

 

Classification

Award Rate per Week

Safety Net Adjustment

Total per Week

 

$

$

$

Division A

482.60

19

501.60

Division B

499.50

19

518.50

Division C

512.50

19

531.50

Division D

527.50

19

546.50

Division E

552.40

19

571.40

 

(b)        Manually Operated Yards:

 

Classification

Award Rate per Week

Safety Net Adjustment

Total per Week

 

$

$

$

Division A

482.60

19

501.60

Division B

495.30

19

514.30

Division C

499.50

19

518.50

Division D

512.50

19

531.50

Division E

552.40

19

571.40

 

Table 2 - Other Rates and Allowances

 

Item No.

Clause No.

Brief Description

Amount

 

 

 

$

1

5.1.3

Leading Hand

28.70 per week

2

6.3.3

Meal allowance

7.55, then 6.25 for

 

 

 

each subsequent meal

3

5.5.2(a)

Shift allowance - rotating day-afternoon,

7.15 per shift

 

 

day-night, day-afternoon-night shift

 

4

5.5.2(b)

Shift allowance - rotating afternoon-night or

10.65 per shift

 

 

permanent afternoon shift

 

5

5.5.2(c)

Shift allowance - permanent night shift

21.10 per shift

6

5.6.1

Piecework

2.00 per day

7

5.6.6

Hand Setting - Intermittent Fired Kilns

 

 

 

 

- Standard Bricks

0.36 per thousand

 

 

 

- Outsize Bricks

0.78 per thousand

8

5.6.6

Hand Setting - Standard Face Bricks

0.38 per thousand

 

 

 

- Outsize Bricks

0.62 per thousand

9

4.6.3

Attending - 3 Oil Fired Kilns

9.95 per shift or

 

 

 

part thereof

 

 

 

- 4 Oil Fired Kilns

22.75 per shift or

 

 

 

part thereof

10

4.7.6

Stacking Bricks - up to 9 metres from wicket

2.50 per thousand

 

 

 

- more than 9 metres from wicket

0.80 per thousand

 

 

 

for each further 9

 

 

 

metres or part thereof

 

 

 

- Classers - more than 37

1.50 per thousand,

 

 

 

metres from wicket

then 0.99 for each

 

 

 

additional 9 metres

11

5.5.3

Travel allowance

3.10 per day

12

5.5.4

Manganese Dioxide - handling

0.49 per hour

13

5.5.5

First-aid

$1.85 per day

 

3.          This variation shall take effect from the first full pay period commencing on or after 17 July 2004.

 

 

 

T. M. KAVANAGH  J.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'