QUARRIES, &c. (STATE) AWARD
  
Date01/06/2006
Volume355
Part5
Page No.1159
DescriptionVSW - Variation following State Wage Case
Publication No.C4043
CategoryAward
Award Code 569  
Date Posted01/06/2006

spacer image spacer image

spacer image Click to download*
spacer image
(569)

(569)

SERIAL C4043

 

QUARRIES, &c. (STATE) AWARD

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by The Australian Workers' Union of Australia, New South Wales Branch, industrial organisation of employees.

 

(No. IRC 3582 of 2005)

 

Before The Honourable Justice Backman

21 July 2005

 

VARIATION

 

1.          Delete clause 3.8, Safety Net Adjustments, of the award published 30 June 2000 (316 I.G. 961), and insert in lieu thereof the following:

 

3.8.  Safety Net Adjustments

 

The rates of pay in this award include the adjustments payable under the State Wage Case 2005.  These adjustments may be offset against:

 

(a)        any equivalent overaward payments; and/or

 

(b)        award wage increases since 29 May 1991 other than safety net, State Wage Case, and minimum rates adjustments.

 

2.          Delete Part 7, Monetary Rates, and insert in lieu thereof the following:

 

PART 7

 

MONETARY RATES

 

Table 1A - Wages

 

Classification

SWC 2004

SWC 2005

SWC 2005

 

Amount

Adjustment

Amount

 

$

$

$

Quarry Worker Level One

541.40

17.00

558.40

Quarry Worker Level Two

568.30

17.00

585.30

Quarry Worker Level Three

593.30

17.00

610.30

Quarry Worker Level Four

616.20

17.00

633.20

Quarry Worker Level Five

628.70

17.00

645.70

Quarry Worker Level Six

641.20

17.00

658.20

Quarry Worker Level Seven

651.20

17.00

668.20

Quarry Tradesperson Level One

641.20

17.00

658.20

Quarry Tradesperson Level Two

661.70

17.00

678.70

Quarry Tradesperson Level Three

664.80

17.00

681.80

Quarry Tradesperson Level Four

685.30

17.00

702.30

Quarry Tradesperson Level Five

736.10

17.00

753.10

 

The rates in Table 1A above include and consume the "Industry Disability" allowance and the "Inclement Weather" allowance, (i.e. the rates in Table 1B continue to attract the "Disability Allowance", Item 26, Table 2).  Accordingly, the rates in Table 1A above compensate employees for working in the open in quarries and thereby being subject to climatic conditions such as dust blowing in the wind, sloppy and muddy conditions and the lack of usual amenities associated with factory work etc., and for the additional disabilities of being required to work when exposed to inclement weather and for working in isolated and underdeveloped locations. "Inclement weather" means wet weather and/or abnormal climatic conditions such as hail, cold, high winds, severe dust storms, extreme high temperatures or any combination thereof.

 

Table 1B - Lime Making Wages

 

Classification

SWC 2004

SWC 2005

SWC 2005

 

Amount

Adjustment

Amount

 

$

$

$

Lime Burner attending to more than three

 

 

 

fire holes - cents extra

488.70

17.00

505.70

Arch Builder

467.40

17.00

484.40

Ash Wheeler

467.40

17.00

484.40

Labourer

467.40

17.00

484.40

Machine Person

474.65

17.00

491.65

Pepper Machinist

467.40

17.00

484.40

Powder Monkey

474.65

17.00

491.65

Powder Monkey’s assistant

467.40

17.00

484.40

Jumper Person

467.40

17.00

484.40

Hammer Drill Person

467.40

17.00

484.40

Spawler

472.00

17.00

489.00

Tool Sharpener

467.40

17.00

484.40

Skip person Tip person

467.40

17.00

484.40

Truck Driver 5 Tonne Truck

467.40

17.00

484.40

Stripper

480.65

17.00

497.65

Box Filler in Quarry

467.40

17.00

484.40

Operators of navvy, petrol oil or electric operated:

Up to & including .57 cubic metres

467.40

17.00

484.40

Over .57 cubic metres and up to & including 1.5

 

 

 

cubic metres

468.50

17.00

485.50

Over 1.5 cubic metres and up to and

 

 

 

including 5.3

478.50

17.00

495.50

Over 3 cubic metres and up to and including

 

 

 

5.3 cubic metres

494.80

17.00

511.80

Over 5.3 cubic metres

500.25

17.00

517.25

Operator of plant used as rear and or bottom and or side dumps

12 tonnes or more but not exceeding 15 tonnes

471.10

17.00

488.10

15 tonnes or more but not exceeding 20 tonnes

477.00

17.00

494.00

20 tonnes or more

478.95

17.00

495.95

Tractor Unit Plant

 

 

 

48kw & under

467.40

17.00

484.40

Over 48kw

477.15

17.00

494.15

Over 97kw to 220kw

482.80

17.00

499.80

Tractors whilst sing power operated attachments

 

 

 

48kw and under

467.40

17.00

484.40

Over 48kw to 97kw

478.95

17.00

495.95

Loader front end and overhead:

 

 

 

appropriate tractor rate grader self propelled over

 

 

 

30kw

478.75

17.00

495.75

Grader self propelled under 30kw

469.80

17.00

486.80

Air compressor Operator

467.40

17.00

484.40

 

Table 2 - Other Rates and Allowances

 

Item No

Clause No

Brief Description

SWC 2004

SWC 2005

 

 

 

Amount

Amount

 

 

 

$

$

1

3.1(5)(a)

In charge of plant

12.40 per week

12.75 per week

 

3.1(5)(b)

Leading hand allowances

 

 

2

 

2 to 5 employees

18.40 per week

18.95 per week

3

 

6 to 10 employees

25.80 per week

26.55 per week

4

 

11 to 20 employees

36.70 per week

37.80 per week

5

 

More than 20 employees

46.60 per week

48.00 per week

6

3.1(6)(a)

Confined spaces

0.55 per hour

0.57 per hour

7

3.1(6)(b)

Dirty work

0.41 per hour

0.42per hour

8

3.1(6)(c)

Height money

0.31 per hour

0.32 per hour

 

3.1(6)(d)

Hot places

 

 

9

 

Between 46 & 54 degrees Celsius

0.40 per hour

0.41 per hour

10

 

Exceeds 54 degrees Celsius

0.55 per hour

0.57 per hour

11

3.3(1)

Tools

11.90 per week

12.20 per week

12

3.4(2)

First Aid allowance

2.00 per day

2.06 per day

13

3.7(6)(b)

Meal allowance

10.70 per meal

11.00 per meal

14

3.7(6)(c)

Board and lodging

332.70 per week

347.00 per week

15

3.7(7)

Motor vehicle allowance

0.46 per km

0.47 per km

16

3.7(8)

Transport not available

5.10 per day

5.25 per day

17

4.7(5)(a)

Meal allowance

10.70 per meal

11.00 per meal

18

4.7(5)(b)

Meal allowance

10.70 per meal

11.00 per meal

Lime-making related allowances

19

3.5(3)

Attending to generator/dynamo

16.00

16.50

20

3.5(4)

In charge of plant

16.00

16.50

21

3.5(5)

Leading hands

 

 

 

 

Less than 3 employees

9.90

10.20

 

 

3 to 6 employees

16.70

17.20

 

 

More than 6 employees

21.00

21.65

22

3.5(2)(iv)

Afternoon shift

35.80

36.85

23

3.5(1)

Disability Allowance

33.50

34.50

 

"Note": These allowances are contemporary for expense related allowances as at 30 March 2005 and for work related allowances are inclusive of adjustment in accordance with the June 2005 State Wage Case Decision of the Industrial Relations Commission of New South Wales.

 

3.          This variation shall take effect from the first full pay period to commence on or after 10 August  2005.

 

 

 

A. F. BACKMAN  J.

 

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'