BUILDING INDUSTRY - CONTRACT FLOOR LAYER MINIMUM RATE ORDER AWARD
  
Date03/17/2006
Volume358
Part1
Page No.223
DescriptionVIRC - Variation by Industrial Relations Commission
Publication No.C4405
CategoryAward
Award Code 066  
Date Posted03/17/2006

spacer image spacer image

spacer image Click to download*
spacer image
(066)

(066)

SERIAL C4405

 

BUILDING INDUSTRY - CONTRACT FLOOR LAYER MINIMUM RATE ORDER AWARD

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Construction, Forestry, Mining and Energy Union (New South Wales Branch), industrial organisation of employees.

 

(No. IRC 6110 of 2005)

 

Before The Honourable Justice Backman

14 December 2005

 

VARIATION

 

1.          Delete clause 2, Rates of Payment, of the award published 29 April 2005 (350 I.G. 559), and insert in lieu thereof the following:

 

2.  Rates of Payment

 

Schedule Of Commercial Rates

 

 

$

Daily Minimum Charge

136.72

Hourly Rate

36.99

Fixing Rates

 

Vinyl Tiles 20-49m2

6.41

 

50-100m2

5.11

 

100-249m2

3.84

 

250 and over

2.76

Sheet Vinyl (incl. Welding)

 

 

20-49m2

7.25

 

50-249m2

4.97

 

250 and over

4.43

For Safety Vinyl and Corlon

1.60

For Safety Vinyl over 3mm

2.44

For Linoleum

2.44

Hardboard Underlay (including supply of staples by contractor)

 

 

20-49m2

6.83

 

50m2 and over

4.69

Restaple Hardboard m2

1.97

Hardboard Underlay on pineboard

 

 

M2 Additional Rate

0.70

Decorative Tiles - VT rate + 50%

 

Decorative Tiles - Boarders and squares - Decorative Tile + 50%

 

Cork Tile - laying out m2

8.60

PVC nosing Lin Metre

4.34

Aluminium Nosing to Timber per lm

5.87

Aluminium Nosing to Concrete per lm

9.97

Stair Treads per lm

5.29

Stair Risers per lm

5.29

Treads and Risers covered per lm

9.97

Ripple trims to timber per lm

2.94

Ripple trims to concrete per lm

5.29

100mm skirting per lm

2.30

150mm skirting per lm

2.87

100mm flat skirting over carpet or smoothedge - per lm

3.00

150mm flat skirting over carpet or smoothedge - per lm

3.37

Reducing and capping strip - per lm

2.61

Preform cove - per lm

2.00

Stringer to walls per lm

4.53

Stringer to stairs per lm

12.02

Cementuous skim coat 1mm

2.15

Smoothing compound (k15/k10)

2.61

 

Above two items include priming and sanding

 

Cement based primer

2.13

Two pack primer

0.70

Grinding concrete - hourly rate

36.14

Acid etch etc - hourly rate

36.14

Fill expansion joints - hourly rate

36.14

 

Raking and cutting included in rates

 

Cover sheet vinyl up to 100mm height per lm

5.29

Cover sheet vinyl over 100mm height per lm

5.87

Rubber tiles m2

9.90

Sheet Vinyl to walls (incl. Welding)

12.75

Bulletin Board m2

17.03

Take Ups

 

 

Take up

loose lay m2

1.63

 

Take up

stuck m2

5.02

 

Take up

PVA mr

8.29

 

Take up

hardboard and coverings including removal of staples m2

 

 

Take up

stair tread nosing (PVC) - per lm

1.33

 

Take up

stair tread nosing (Alum) - per lm

5.02

Bar Tops

41.31

Fares/Travel

 

 

Travelling time outside metropolitan area per hour

30.68

 

Accommodation per day

98.05

 

Travelling per km return

0.92

Moving Furniture - Hourly Rate

36.14

Cancellation Fee

43.75

 

SCHEDULE OF DOMESTIC FIXING RATES

 

Minimum Charge

$

183cm x 2m vinyls (except inlaid) - 1m

18.49

183cm inlaid vinyl (if layer supplies template paper - 1m

22.68

274cm vinyl - 1m

25.65

366cm x 4m vinyl - 1m

30.64

Daytile with border and squares m2

13.82

Vinyl tiles m2

10.73

Hardboard m2

7.68

K10 and Ardit (labour only) m2

2.87

PVA (labour only) m2

11.35

Additional rate for stairs in addition to rate per metre - per stair

5.07

Cove skirting - 1m

4.54

Preform fillet - 1m

2.87

TAKE UPS:

21.33

Loose laid material per room

 

Stuck down including hardboard m2

10.73

Direct to subfloor m2

14.24

Electrical appliances, removal and replace - per appliance

7.09

MINIMUM CHARGES (labour only) PVA:

 

Laundry

133.59

Bathroom

133.59

Other areas (of total job etc)

76.33

Ardit Z8

76.33

Mastick K10

76.33

ACCESSORIES, TRIM ETC.

 

 

Small - 1m

3.09

 

Large - 1m

2.94

 

To supply adhesive m2

0.99

CANCELLATION CHARGE: travel time to & from employers premises to site

--

at hourly rate

 

SERVICE CHARGE: If layer has to return to site to carry out rectification not

43.75

own fault - hourly rate plus the service charge shown

 

 

2.          Delete the amount of "$35.90" appearing in paragraph 4.1(a), of clause 4, Compensation for Travel Patterns, Mobility Requirements of Contract Floor Layers and the Nature of Engagement in the Construction Work Covered by this Award, and insert in lieu thereof the following:

 

"$36.99"

 

3.          Delete amount of "$95.17" appearing in subclause 5.1 of clause 5, Living Away from Home - Distant Work, and insert in lieu thereof the following:

 

"$98.05"

 

4.          Delete subclause 7.3 of clause 7, Adjustment of Rates, and insert in lieu thereof the following:

 

7.3        The rates of pay in this award include adjustments payable under the State Wage Case 2005. These adjustments may be offset against:

 

any equivalent overaward payments, and/or

 

award wage increases since May 1991 other than safety net, State Wage Case and minimum rates adjustments.

 

5.          Delete the amount of "$42.96" appearing in subclause 10.2 of clause 10, Rectification Work, and insert in lieu thereof the following:

 

"$44.26"

 

6.          This variation shall take effect from the beginning of the first pay period to commence on or after 30 November 2005.

 

 

 

A. F. BACKMAN  J.

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'