Item No
|
Clause No.
|
Brief
Description
|
Current Amount
|
SWC 2006
|
|
|
|
|
Adjustment
|
|
|
|
|
effective from
|
|
|
|
|
FFPP 26/03/2007
|
|
|
|
$
|
$
|
1
|
6(2)(a)(i),(ii),(iii)
|
Journeyman Plumber (Other
|
|
|
|
|
than Ship’s Plumber) - Industry
|
|
|
|
|
Allowance
|
21.60 per week
|
22.50 per week
|
|
|
Tool Allowance
|
21.60 per week
|
22.50 per week
|
|
|
Supplementary Payment
|
52.10 per week
|
52.10 per week
|
|
|
Special Allowance
|
7.70 per week
|
7.70 per week
|
|
6(2)(b)
|
Registration Allowance
|
0.58 per hour
|
0.60 per hour
|
|
|
Amount deducted from hourly
|
0.05
|
0.05
|
|
|
rate of journeyman plumber for
|
|
|
|
|
Drainer
|
|
|
2
|
6(2)(c)(i),(ii),(iii),
|
Ship’s Plumber -
|
|
|
|
(iv)
|
Industry Allowance
|
11.40 per week
|
11.90 per week
|
|
|
Tool Allowance
|
21.60 per week
|
22.50 per week
|
|
|
Supplementary Payment
|
52.10 per week
|
52.10 per week
|
|
|
Special Allowance
|
7.70 per week
|
7.70 per week
|
|
|
Registration Allowance
|
0.58 per week
|
0.60 per week
|
|
6(2)(d)(iii)(a)
|
Ships Plumbers Apprentice
|
4.79 per week
|
4.98 per week
|
3
|
7(i)(a)
|
Plumber’s Licence
|
0.74 per hour
|
0.77 per hour
|
4
|
7(i)(b)
|
Gasfitter’s Licence
|
0.74 per hour
|
0.77 per hour
|
5
|
7(i)(c)
|
Drainer’s Licence
|
0.64 per hour
|
0.67 per hour
|
6
|
7(i)(d)
|
Plumber’s and Gasfitter’s
Licence
|
1.00 per hour
|
1.04 per hour
|
7
|
7(i)(e)
|
Plumber’s and Drainer’s Licence
|
1.00 per hour
|
1.04 per hour
|
8
|
7(i)(f)
|
Gasfitter’s and drainer’s
Licence
|
1.00 per hour
|
1.04 per hour
|
9
|
7(i)(g)
|
Plumber’s gasfitter’s and
Drainer’s
|
|
|
|
|
Licence
|
1.38 per hour
|
1.43 per hour
|
10
|
7(ii)
|
Licensed Drainer
|
0.64 per hour
|
0.67 per hour
|
11
|
7(iii)(a)
|
Lead Burner
|
0.65 per hour
|
0.68 per hour
|
12
|
7(iii)(b)
|
Lead Burner in Chemical Works
|
0.90 per hour
|
0.94 per hour
|
13
|
7(iii)(c)(1)
|
Oxyacetylene or Electric Welding
|
|
|
|
|
Certificate
|
0.46 per hour
|
0.48 per hour
|
|
|
Minimum Payment
|
3.24 per day
|
3.37 per day
|
14
|
7(iii)(c)(2)
|
Certificate Holder
|
0.67 per hour
|
0.70 per hour
|
|
|
performing welding to
|
|
|
|
|
AS4041-1998 Minimum
|
|
|
|
|
Minimum Payment
|
5.15 per day
|
5.36 per day
|
15
|
7(iii)(d)
|
Computing quantities or make-up
|
|
|
|
|
estimates
|
0.49 per hour
|
0.51 per hour
|
17
|
9
|
Leading Hands -
|
|
|
|
|
In charge of up to two employees
|
0.67 per hour
|
0.70 per hour
|
|
|
In charge of three to five employees
|
0.80 per hour
|
0.83 per hour
|
|
|
In charge of six to ten
employees
|
1.04 per hour
|
1.08 per hour
|
|
|
In charge of ten or more
employees
|
1.32 per hour
|
1.37 per hour
|
18
|
10
|
Employed on any chokage or oil
|
|
|
|
|
chokage etc.
|
5.55 per day
|
5.77 per day
|
19
|
11(i)
|
Wet Work
|
0.49 per hour
|
0.51 per hour
|
20
|
11(ii)
|
Insulation material
|
0.61 per hour
|
0.63 per hour
|
21
|
11(iii)
|
Cold Work
|
0.49 per hour
|
0.51 per hour
|
22
|
11(iv)
|
Work on WC,s, urinals, soil or
waste
|
|
|
|
|
pipes where used principally by
|
|
|
|
|
venereal patients
|
0.61 per hour
|
0.63 per hour
|
23
|
11(v)
|
Hot Work
|
|
|
|
|
between 46 and 54 degrees
Celsius
|
0.47 per hour
|
0.49 per hour
|
|
|
exceeding 54 degrees Celsius
|
0.61 per hour
|
0.63 per hour
|
24
|
11(vi)
|
Work with second-hand materials
|
|
|
|
|
of an unusually dirty or
offensive
|
|
|
|
|
nature
|
0.49 per day
|
0.51 per day
|
25
|
11(vii)
|
Employed inside buildings where
|
|
|
|
|
chlorine gas and/or hydrogen
|
|
|
|
|
sulphide gas re-manufactured
|
0.62 per day
|
0.64 per day
|
26
|
11(viii)
|
Engaged on electric welding
|
|
|
|
|
applicable to plumbing
|
0.12 per hour
|
0.12 per hour
|
27
|
11(ix)
|
Operator of explosive powered
tools
|
1.16 per day
|
1.21 per day
|
28
|
11(x)(a)
|
Work in maximum security
|
1.25 per hour
|
1.30 per hour
|
29
|
11(x)(b)
|
Work in a geriatric hospital
|
0.34 per hour
|
0.35 per hour
|
30
|
11(xi)
|
Roof Repairs
|
0.69 per hour
|
0.72 per hour
|
|
|
Minimum Payment
|
0.69
|
0.72
|
31
|
11(xiii)
|
Employed in mental institutions
|
0.41 per hour
|
0.43 per hour
|
32
|
11(xiv)
|
Engaged in tunnel and sewer work
|
|
|
|
|
and in underground shafts
|
|
|
|
|
exceeding 3 metres in depth
|
0.50 per hour
|
0.52 per hour
|
33
|
11(xv)
|
Engaged on alterations or
repairs
|
|
|
|
|
to boilers, flues, furnaces,
retorts
|
1.31 per hour
|
1.36 per hour
|
|
|
and kilns
|
|
|
34
|
11(xvi)
|
Engaged on the construction of
|
|
|
|
|
chimneys and air shafts where
|
|
|
|
|
construction exceeded 15 metres
in
|
|
|
|
|
height
|
0.49 per hour
|
0.51 per hour
|
|
|
Additional amount for work above
|
|
|
|
|
each further 15 metres
|
0.49 per hour
|
0.51 per hour
|
35
|
11(xvii)
|
Employees required to work in a
|
|
|
|
|
bosun’s chair or on a swinging
|
|
|
|
|
scaffold - First 4 hours
|
3.55
|
3.69
|
|
|
For each hour thereafter
|
0.73 per hour
|
0.76 per hour
|
36
|
11(xviii)
|
Work on any structure at a
height
|
|
|
|
|
of more than 12.2 metres
|
0.49 per hour
|
0.51 per hour
|
37
|
11(xix)
|
Employees in sanitary works
|
5.45 per day
|
5.67 per day
|
38
|
11(xx)
|
Employees in slaughtering yards
|
0.33 per hour
|
0.34 per hour
|
39
|
11(xxii)(a)
|
Employees working west and north
|
|
|
|
|
of and excluding State Highway
|
|
|
|
|
No 17 etc., up to the Western
|
|
|
|
|
Division
|
0.80 per day
|
0.83 per day
|
40
|
11(xxii)(b)
|
Employees working in the Western
|
1.31 per day
|
1.36 per day
|
|
|
Division
|
|
|
41
|
11(xxii)(c)
|
Employees working in the
southern
|
|
|
|
|
districts
|
1.31 per day
|
1.36 per day
|
42
|
11(xxiii)
|
Engaged in cramped position or
|
|
|
|
|
without sufficient ventilation
|
0.61 per hour
|
0.63 per hour
|
43
|
11(xxiv)
|
Employees required to use
materials
|
|
|
|
|
containing asbestos or to work
near
|
|
|
|
|
asbestos
|
0.61 per hour
|
0.63 per hour
|
4
|
11(xxv)
|
Towers Allowance
|
|
|
|
|
Exceeding 15 metres - for all
work
|
|
|
|
|
above metres
|
0.49 per hour
|
0.51 per hour
|
|
|
For work above each further15
|
|
|
|
|
metres
|
0.49 per hour
|
0.51 per hour
|
45
|
11(xxvi)(c)
|
Toxic Substances
|
|
|
|
|
Employees using
|
0.61 per hour
|
0.63 per hour
|
|
|
Employees working in close
|
|
|
|
|
proximity
|
0.49 per hour
|
0.51 per hour
|
46
|
11(xxxi)(d)
|
Engaged in asbestos
eradication
|
1.64 per hour
|
1.71 per hour
|
47
|
12(i)
|
Employees working in ballast
|
0.61 per hour
|
0.63 per hour
|
|
|
tanks, oil tanks and side
tanks
|
|
|
48
|
12(ii)
|
Employees working in ship’s
|
|
|
|
|
bilges or under engine room or
|
|
|
|
|
boiler room flooring
|
0.44 per hour
|
0.46 per hour
|
49
|
12(iii)
|
Employees working in and
around
|
|
|
|
|
diesel engines
|
0.44 per hour
|
0.46 per hour
|
50
|
12(iv)
|
Employees working in a
confined
|
0.64 per hour
|
0.67 per hour
|
|
|
space
|
|
|
51
|
12(v)(1)
|
Employees working inside a
hull
|
0.77 per hour
|
0.80 per hour
|
52
|
12(v)(2)
|
Employees working in torpedo
|
|
|
|
|
tube compartments, ballast
tanks,
|
|
|
|
|
oil tanks, below floor plates
|
1.39 per hour
|
1.45 per hour
|
53
|
12(vi)
|
Plumber in pipe laundry
|
0.99 hour
|
1.03 hour
|
54
|
13(iii)
|
Multi-story Allowance-
|
|
|
|
|
From commencement to
|
|
|
|
|
15tth floor
|
0.39 per hour
|
0.41 per hour
|
|
|
from 16th to 30th floor
|
0.47 per hour
|
0.49 per hour
|
|
|
from 31st to 45th floor
|
0.73 per hour
|
0.76 per hour
|
|
|
from 46th to 60th floor
|
0.94 per hour
|
0.98 per hour
|
|
|
From 61st floor onwards
|
1.17 per hour
|
1.22 per hour
|
73
|
43(ii)
|
First-aid Allowance
|
2.09
|
2.17
|