TRANSPORT INDUSTRY - EXCAVATED MATERIALS, CONTRACT DETERMINATION
  
Date11/17/2006
Volume361
Part5
Page No.911
DescriptionVIRC - Variation by Industrial Relations Commission
Publication No.C5146
CategoryAward
Award Code 680  
Date Posted11/15/2006

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(680)

SERIAL C5146

 

Transport Industry - Excavated Materials, Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(No. IRC 2435 of 2006)

 

Before Mr Deputy President Sams

20 July 2006

 

AWARD

 

1.          Delete Part B, Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

$

$

$

$

$

$

1.

Loading Rate

15.450

24.057

29.216

34.762

37.434

40.673

1A.

Extra capacity (per cubic metre)

2.663

2.663

2.663

2.663

2.663

2.663

2.

Kilometre Rate (0-8)

3.885

6.052

7.350

8.746

9.416

10.231

2A.

Extra Capacity (per cubic metre)

0.672

0.672

0.672

0.672

0.672

0.672

3.

Kilometre Rate (over 8-25)

3.596

5.600

6.802

8.093

8.717

9.471

3A.

Extra Capacity (per cubic metre)

0.620

0.620

0.620

0.620

0.620

0.620

4.

Kilometre Rate (over 25)

3.333

5.187

6.303

7.501

8.070

9.471

4A.

Extra Capacity (per cubic metre)

0.576

0.576

0.576

0.576

0.576

0.576

5.

City Rate

9.247

14.398

17.486

27.194

30.395

33.487

5A.

Extra Capacity (per cubic metre)

1.600

1.600

1.600

1.600

1.600

1.600

6.

Hourly Rate

50.652

78.871

95.824

113.926

122.692

139.605

6A.

Extra Capacity (per cubic metre)

8.762

8.762

8.762

8.762

8.762

8.762

7.

Ramp Rate

4.129

6.430

7.808

12.145

13.575

14.952

7A.

Extra Capacity (per cubic metre)

0.714

0.714

0.714

0.714

0.714

0.714

8.

Large Material

15.047

23.431

28.458

44.261

49.468

54.495

8A.

Extra Capacity (per cubic metre)

2.604

2.604

2.604

2.604

2.604

2.604

 

2.          This variation shall take effect from the first pay period to commence on or after the 1 July 2006.

 

 

 

P. J. SAMS D.P.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.