Building
Crane Drivers (State) Award
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Construction,
Forestry, Mining and Energy Union (New South Wales Branch), Industrial
Organisation of Employees.
(No. IRC 3058 of 2006)
Before Commissioner
Cambridge
|
27 September 2006
|
VARIATION
1. Delete Table
2 - Other Rates and Allowances of Part B - Monetary Rates, of the award
published 22 April 2005 (350 I.G. 345), and insert in lieu thereof the following:
Table 2 - Other Rates and Allowances
Item
|
Clause
|
Brief Description
|
Amount
|
No.
|
No.
|
|
$
|
1.
|
8(iii)
|
Overtime meal allowance
|
10.90 per meal
|
2.
|
8
(iii) (a)
|
Meal interval
|
10.90 per meal
|
3.
|
10A(i)
|
Travel Allowance
|
14.20 per day
|
4.
|
10A(ii)
|
Travel within 50 km from depot
|
14.20 per day
|
5
|
10
I (ii)
|
Transfer of Work Sites
|
0.83 cents per klm
|
6.
|
10
D (i)(b)
|
Excess travel
|
0.42 cents per klm
|
7.
|
10M
|
Travelling time allowance
|
9.15 per week
|
8.
|
11
(iii) (b)
|
Living away from home weekly rate
|
381.10 per week
|
9.
|
11
(iii) (b)
|
Living away from home daily rate
|
54.50 per day
|
10.
|
11
(v) (c) (iii)
|
Meals while travelling
|
10.90 p/meal
|
11.
|
11
(vi)
|
Return journey
|
18.40
|
12.
|
11
(xi) (b)
|
Weekly camping rate
|
152.90 per week
|
13.
|
11
(xi) (b)
|
Daily camping rate
|
21.90 per day
|
14.
|
12A
|
Industry Allowance
|
22.60 per week
|
15.
|
12B
|
Multi Storey Allowance -
|
|
|
|
From 4th floor level to 10th floor level
|
0.45 per hour extra
|
|
|
From 11th floor level to 15th floor level
|
0.51 per hour extra
|
|
|
From 16th floor level to 20th floor level
|
0.60 per hour extra
|
|
|
From 21st floor level to 25th floor level
|
0.76 per hour extra
|
|
|
From 26th floor level to 30th floor level
|
0.93 per hour extra
|
|
|
From 31st floor level to 40th floor level
|
0.98 per hour extra
|
|
|
From 41st floor level to 50th floor level
|
1.12 per hour extra
|
|
|
From 51st floor level to 60th floor level
|
1.29 per hour extra
|
|
|
From 61st floor level onwards
|
1.36 per hour extra
|
16.
|
12C
|
Towers Allowance
|
|
|
|
Up to 15 metres
|
0.51 per hour
|
|
|
For every additional 15 metres
|
0.51 per hour
|
17.
|
12D(ii)
|
Dirty work
|
0.51 per hour extra
|
2. This variation
shall take effect from the beginning of the first pay period to commence on or
after 11 September 2006.
I.
W. CAMBRIDGE, Commissioner
____________________
Printed by
the authority of the Industrial Registrar.