Hy-Tec Industries Pty Ltd - Maxi Concrete Contract Determination
  
Date03/30/2023
Volume393
Part8
Page No.1741
DescriptionVCD - Variation of Contract Determination
Publication No.C9621
CategoryContract Determination
Award Code 1923  
Date Posted03/31/2023

spacer image spacer image

spacer image Click to download*
spacer image

(1923)

SERIAL C9621

 

Hy-Tec Industries Pty Ltd - Maxi Concrete Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Hy-Tec Industries Pty Ltd.

 

(Case No. 10206 of 2023)

 

Before Commissioner Sloan

20 February 2023

 

VARIATION

 

1.        Delete subclause 2, Hy-Tec to Pay Current Rates, Surcharges and Fees, of Schedule 1 - Rates, Surcharges and Fees, of the award published 19 November 2021 (390 I.G. 1190), and insert in lieu thereof the following:

 

2.  Hy-Tec to Pay Current Rates, Surcharges and Fees

 

2.1      Subject to subclause 2.4 of this Schedule, Hy-Tec will:

 

(a)       pay to the Contract Carriers the out of hours surcharges set out in the table at subclause 2.3 below;

 

(b)      continue to pay to the Contract Carriers all other:

 

(i)       Rates;

 

(ii)      surcharges (except for any out of hours surcharges); and

 

(iii)     fees, on the basis they were paid to the Contract Carriers as at the date this Contract Determination was made; and

 

(c)       continue to apply the periodic rise and fall formula on the basis it was applied to all Rates, Surcharges and Fees from the date this Contract Determination is varied.

 

2.2

 

(a)       Despite subclause 2.1(c), the cost and rate model used to derive utilisation based cartage rates shall operate with a lower threshold of 5500m3 and an upper threshold of 9500m3.

 

(b)      Leave reserved is granted to the parties to apply as they see fit in regard to the cost and rate model used to derive the utilisation based cartage rates.

 

2.3      Table of Out of Hours Surcharges

 

6 Wheeler

Surcharge

Application

Amount

Surcharge 1

Monday to Friday after 5.00am and up to and

$9.53 per m3 (min 3.0 m3)

 

including 6.00am

 

 

 

 

 

Monday to Friday from 5.00pm and before 7.00pm

 

Surcharge 2

Monday to Friday from 7.00pm and up to and

$15.24 per m3 (min 3.0 m3)

 

including 5.00am

 

 

 

 

 

Before 6.00am on a Saturday

 

Surcharge 3

Saturday 1.00pm to 5.00pm

$15.24 per m3 (min 3.0 m3)

Surcharge 4

Saturday after 5.00pm

$22.54 per m3

Surcharge 5

Sunday

$22.54 per m3

Surcharge 6

Public Holiday

$30.05 per m3

 

8 Wheeler

Surcharge

Application

Amount

Surcharge 1

Monday to Friday after 5.00am and up to and

$8.46 per m3 (min 3.6 m3)

 

including 6.00am

 

 

Monday to Friday from 5.00pm and before 7.00pm

 

Surcharge 2

Monday to Friday from 7.00pm and up to and

$13.55 per m3 (min 3.6 m3)

 

including 5.00am

 

 

Before 6.00am on a Saturday

 

Surcharge 3

Saturday 1.00pm to 5.00pm

$13.55 per m3 (min 3.6 m3)

Surcharge 4

Saturday after 5.00pm

$20.05 per m3

Surcharge 5

Sunday

$20.05 per m3

Surcharge 6

Public Holiday

$26.74 per m3

 

2.4      The Rates and/or Surcharges and Fees and/or the rise and fall formula referred to in subclauses 2.1 and 2.3 of this Schedule may be changed subject to:

 

(a)       agreement between Hy-Tec and the Contract Carrier Executive; or

 

(b)      variation of this Contract Determination in accordance with the Industrial Relations Act 1996.

 

2.        This variation will take effect from the first full pay period commencing on or after 6 February 2023.

 

 

 

D. SLOAN, Commissioner

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'