State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

TRANSPORT INDUSTRY - EXCAVATED MATERIALS CONTRACT DETERMINATION
  
Date01/27/2006
Volume356
Part3
Page No.977
DescriptionVCD - Variation of Contract Determination
Publication No.C4001
CategoryAward
Award Code 680  
Date Posted01/27/2006

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(680)

SERIAL C4001

 

TRANSPORT INDUSTRY - EXCAVATED MATERIALS CONTRACT DETERMINATION

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of Australia, New South Wales Branch, industrial organisation of employees.

 

(No. IRC 4900 of 2004)

 

Before Commissioner Connor

12 August 2005

 

VARIATION

 

1.          Delete Part B, Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

Interim Increase

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

($)

($)

($)

($)

($)

($)

1.   Loading Rate

14.371

22.377

27.176

32.335

34.820

37.833

1A. Extra capacity (per cubic metre)

2.477

2.488

2.488

2.488

2.488

2.488

2.   Kilometre Rate (0-8)

3.614

5.629

6.837

8.135

8.759

9.517

2A. Extra Capacity (per cubic metre)

0.625

0.625

0.625

0.625

0.625

0.625

3.   Kilometre Rate (over 8-25)

3.345

5.209

6.327

7.528

8.108

8.810

3A. Extra Capacity (per cubic metre)

0.577

0.577

0.577

0.577

0.577

0.577

4.   Kilometre Rate (over 25)

3.100

4.825

5.863

5.703

7.507

8.810

4A. Extra Capacity (per cubic metre)

0.536

0.536

0.536

0.536

0.536

0.536

5.   City Rate

8.601

13.393

16.265

25.295

28.273

31.149

5A. Extra Capacity (per cubic metre)

1.488

1.488

1.488

1.488

1.488

1.488

6.   Hourly Rate

47.116

73.364

89.134

105.972

114.126

129.858

6A. Extra Capacity (per cubic metre)

8.150

8.150

8.150

8.150

8.150

79.691

7.   Ramp Rate

3.841

5.981

7.263

11.297

12.627

13.908

7A. Extra Capacity (per cubic metre)

0.664

0.664

0.664

0.664

0.664

0.664

8.   Large Material

13.996

21.795

26.471

41.171

46.014

50.690

8A. Extra Capacity (per cubic metre)

2.422

2.422

2.422

2.422

2.422

2.422

 

2.          Delete Part C - Rise and Fall Formula and insert in lieu thereof the following:

 

PART C

 

Rise and Fall Formula

 

A.  Benchmarks

 

Component

Benchmark

Wages

Transport Industry (State) Award, as varied, Transport Worker Grade 4

Fuel

B.P. Ltd Head Office Commercial wholesale Bulk, Price per Litre of Taxable Distillate

Repair Parts

Index based upon the following specified basket of parts obtained from source listed at recommended retail prices, including  Sales Tax.

 

Parts

Rear Suspension Bushes

 

 

Brake Lines

 

 

Brake Drums

 

 

Clutch and Pressure Plate

Source

Vehicle Type

Item

Part

 

Hino

Rear Suspension

Brake Linings

Brake Drums

Clutch and

Pressure Plate

Brakes

 

Ford

Rear Suspension

Brake Linings

Brake Drums

Clutch and

Pressure Plate

 

 

Volvo

Rear Suspension

Brake Linings

Brake Drums

Clutch and

Pressure Plate

 

 

International

Rear Suspension

Brake Linings

Brake Drums

Clutch and

Pressure Plate

 

 

NOTE: Price is the total retail  price inclusive of GST and excluding all discounts.

 

Tyres: Goodyear Tyre Co. Head  Office recommended retail price for A steer 11R22.5 tyre only.

 

Quotes:  Quotes for vehicles and tyres should be from the same source and be the same model number and if not possible the closest equivalent model.

 

Depreciation: Index based on the average of the recommended retail price of two cheapest vehicles - as per specification details below.

 

The index is the total of the prices.

 

Rigid three axle bogie

Manufacturer:

Hino, Ford, Volvo, or International

Differential:

40,000 pounds

Gearbox:

15 speed minimum.

Horsepower:

300 hp

Carrying capacity:

9 cubic metres minimum.

Insurance:

Miller & Associates quote of the average of the two vehicles selected for the index.

Registration and Third Party Insurance

Roads and Traffic Authority

Interest

Westpac, Prime Overdraft Rate

Sundries

Based on Increase of C.P.I.

 

B.  Weightings of Cost Components

 

Cost Component

Percentage of Total Cost

Fuel

16.2

Repairs and Maintenance

12.5

Tyres

6.3

Insurance

5.3

Registration

2.5

Depreciation

14.4

Wages

31.7

Interest

7.8

Sundries

3.3

Total:

100.00

 

3.          This variation shall take effect from the first pay period to commence on or after the 12th August 2005.

 

 

P. J. CONNOR, Commissioner.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

 

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'